1984 |
FROCH was established
on October 5, and the plant land of 32,572m
inside Tou-Liu Industrial |
| |
District in Yun-Lin was
purchased. |
1985 |
Phase 1 building was completed. |
1987 |
Phase 2 building and Quality
lnspection Room was completed. |
1988 |
1. Phase 3 building for
warehouse was completed. |
|
|
2. FROCH was endtitled
as Class A Factory for Quality Control and received CNS
certification |
| |
mark ¡À for six kinds of
stainless steel tubes and pipes from Bureau of Standards,
Metrology, and |
| |
Inspection, Ministry of Economic Affairs. |
1989 |
Mainframe computer was installed,
and the execution of MIS began. |
1990 |
1. Phase 4 building was
completed, and FROCH began to improve the layout of
production process |
| |
|
and to renew production facilities. |
| |
2. Office of Presidential
Assistance was set up to execute systematic management. |
| |
3. Tou-Liu Second Plant's
land of 12,310m
was purchased for future expansion. |
1991 |
1. Chiao Tung Bank (formerly
known as Bank of Communications) joined and invested in
FROCH |
| |
|
for autumation of production equipment
to increase production capacity. |
| |
2. FROCH was approved
to be a Qualified Corporation for Stock Opening by Securities
and Futures |
| |
Commission, Ministry of Finance. |
1993 |
FROCH was accredited
with ISO-9001 by Lloyd's Register Quality Assurance. |
1994 |
Yuan-Lin Plant's land of
11,731m was
purchased for future expansion. |
1996 |
1. FROCH was accredited
with ISO-9001 by Bureau of Standards, Metrology, and Inspection |
| |
|
of Economic Affairs. |
| |
2. Tou-Liu Second Plant
building for coil center was completed. |
1998 |
1. Large diameter pipe production
facility was completed. |
| |
2. FROCH's stock
was approved by Securities and Futures Commission to be
listed on Taiwan Stock |
| |
Exchange Corporation. |
1999 |
1. FROCH was accredited
with ISO-14001 by Lloyd's Register Quality Assurance. |
| |
2. Yuan-Lin Plant was completed.
|
2001 |
1. Phase 5 building was
completed, and corporate reengineering along with the procurement
of automatic |
| |
|
equipment was in proceeding. |
| |
2. Investment of Suzhou
Plant in China began, and the construction of plant building
was completed. |
| |
3. Quality Assurance
Laboratory was approved by Chinese National Laboratory
Accreditation (CNLA), |
| |
which is a member of International Laboratory
Accreditation Corporation (ILAC). |